Farenco Shipping Pte. Ltd | Ship Shore Compatibility Study (SSCS) Between LNGC Jia Xing and PETRONAS Pengerang Terminal. Technical Consultant to Ship Owner for Cooling down services of Jia Xing at Pengerang Terminal. | 2023 |
K Line Energy Shipmanagement | Shaft Seal Replacement for Windlass Motor services Calibration Services for Gas Detector services Elevator Annual Inspection Load Test services Supply & Delivery of Vessel’s Stores | 2022 – 2023 |
Carigali HESS | Supply & Delivery of Fan Assembly spares | 2022 |
PNSL BERHAD | Ship Manager and Agents for MV Pos Logistics 1 (PL1) and MV Pos Logistics 2 (PL2) | 2020 – 2022 |
Petronas Floating Liquified Natural Gas 1 (PFLNG 1) | Supply & Delivery of Svanehoj Pumps Spares | 2021 |
Malaysian Towage & Transport (MTT) | Project Management Team for The Resumption of Works for the Construction of Badang Sebelas at KC Team Shipyard Jenjarom, Selangor | 2020- 2022 |
E&P O&M Services Sdn Bhd | Supply & Delivery of Wartsila Spares For FPSO Berantai | 2020 – ongoing |
Petronas Floating Liquified Natural Gas 2 (PFLNG 2) | Supply & Delivery of Hi Air HVAC Spares | 2020 – ongoing |
Farenco Shipping Ltd | Chartering agent of Lucia Ambition Vessel for Cargo Transportation to Shin Minato LNG Terminal, Sendai. (Agency Agreement Bet. FARENCO & ARGO Since 2017) | 2020 |
Petronas LNG Ltd | LNG Break Bulking STS Operations at Brunei Bay from MISC LNGC Seri Bijaksana to TEEKAY LNGC Polar Spirit & MISC LNGC Lerici in October 2019 | 2019 |
PNSL Berhad | Marine Engineering Advisory Services for All Ships Registered to PLB and PNSL. | 2019 |
Malaysian Towage & Transport (MTT) | Technical Consultant/Advisor for Litigation on status of completion for a 50Tonne Bollard Pull Harbour Tug (Badang Sebelas) | 2019 |
Petronas LNG Ltd | LNG Break Bulking STS Operations at Brunei Bay from MISC LNGC Seri Bijaksana to TEEKAY LNGC Arctic Spirit & Polar Spirit in April 2019 | 2019 |
E&P O&M Services Sdn Bhd | Supply for Rental of Mooring Buoy System (Buoy, chains & anchor) for BENTARA field | 2019 |
Petronas (PLSB/PDB) | Engineering Proposal to Convert Lucia Ambition (18,800cbm) as LNGC and LNG Bunkering Capable Vessel | 2019 |
MISC Berhad | Pre-Engineering Study Proposal for FSRU Conversion and FRU Newbuild | 2019 |
Perusahaan Listrik Negara (PLN), Jakarta | Proposal for PLN Amurang Power Project for Conversion of FSU,FRU & FSRU LNG Gas to Power Barge 120MW capacity | 2018 |
Petronas LNG Ltd | LNG Break Bulking STS Operations at Brunei Bay from MISC LNGC Seri Bijaksana to FARENCO LNGC Lucia Ambition in June 2018 | 2018 |
Petronas Carigali Sdn Bhd | Proposal of Consultancy for Field Reliability, Availability and Maintainability (RAM) Model Development Using Reliasoft | 2018 |
Modkha Marine Sdn Bhd | Design Services of C&S and M&E for Clay Processing Factory at Trong, Perak | 2018 |
FPSO Ventures Sdn Bhd | Supply of Hi Air HVAC initial spare parts of FSO Benchamas 2 | 2017 |
Pos Logistics Berhad | Consultancy Services for Ship Acquisition and Ship Management for Pos Logistics Contract of Affreightment (“COA”) for TNB Fuel Services Sdn Bhd. (“TNBF”) | 2017 |
MISC | Dry docking painting & tank coating inspection of LNGC Aman Hakata, Aman Sendai, Puteri Intan Satu , Puteri Intan & Seri Begawan. | 2017 |
Farenco Shipping Ltd. | Provision of Reactivation, Commissioning, Supply full sets of LNG Crews for Lucia Ambition and S&P delivery closing of LNGC Aman Bintulu (Lucia Ambition). Owner’s Agent (Agency Agreement Bet. FARENCO & ARGO Since 2017) for Ship charter. | 2017 |
TCTL Engineering | Technical Consultant/Advisor for Litigation on design and construction of dredger | 2016 |
Gagasan Offshore & Baycorp Shipment | Design Specification of 40m/60m Aluminum/Steel, 80 Pax, 30knot Superfast Crew Boat (SFCB) | 2015 |
PDZ Sdn Bhd | Technical Audit of the Ship Operator (PDZ) and Ship Managers (MAROFF & APEX) for PDZ Sdn Bhd | 2015 |
PDZ Sdn Bhd | Dry Docking Management & Supervision Of PDZ Maju at Huangpu Shipyard, China | 2015 |
Yiu Lian (Shekou) Dockyard, China | Consultancy and Technical Advisor for Yiu Lian Yard to be LNG Repair & Conversion capable to undertake LNG vessels drydocking and conversion as Floating Storage Facilities (FSU) | 2015 |
KFS Services Sdn Bhd/UniKL, Lumut | Prepare UNIKL Yard to be capable to construct three (3) x 50tonne Bollard Pull ASD Tug Boat | 2015 |
Malaysian Towage and Transport (MTT) | Technical Assessment and to complete construction works of one (1) x 50tonne BP ASD Tug Boat at PSE , Port Klang. | 2015 |
SapuraKencana Petroleum | Provide manpower Supply for Carpentry of Drill Tender Vessel(KM2) and Engineering Services for construction works) | 2014 |
INTRA Oil/PETRA Oil | Design and Engineering Services –AHTS Stability Check- and Pull-Out Methodology Proposal | 2014 |
Bureau Veritas | Provide manpower Supply for Engineering Structure Specialist | 2013 |
Sapura Kencana Petroleum Bhd | Plan Approval / Drawing Review – SARKU 82M Offshore work / Accommodation Vessel at Labuan Shipyard | 2013 |
NGV Tech Sdn Bhd | Provide manpower for testing, commissioning and sea trials and the carpentry work for the construction of two (2) x RMN 82m Training Vessels | 2013 |
NGV Tech Sdn Bhd | Appointed as Independence Industry Specialist by Ernst & Young (Receiver Manager on behalf of Maybank) for the construction of two (2) x RMN 82m Training Vessels | 2013 |